|
Here is the rear bag bracket with the cantilever and shock mount.
|
Shown above is one half of the 4 link and the panhard bar and mount.
|
Before.
|
|
Another before show showing the 2 link.
|
Cut the rivets on the rear factory hanger.
|
Cut the rivets on the front factory hanger.
|
|
Remove the rivets from the rear hanger.
|
Now remove them from the front hanger.
|
Using your hammer ofchoice, remove the hangers from the frame. Now would be a good time to clean the frame.
|
|
Bolt on the rear brackets with the 5 matching holes.
|
Mark te missing holes on the frame so you can drill them out.
|
Here you can see the marked holes in red.
|
|
Grab your drill and get to work drilling them out.
|
After all that hard work, move up to the front and easily bolt on the front brackets.
|
After your break, mount the rear brackets.
|
|
Now you can mount the axle saddles to the bottom of the axles with the provided hardware.
|
Install the 4 link bars and the parking break bracket.
|
Connect the link bars to the axle. Don't forget to adjust your pinion angle properly first.
|
|
Now you can mount the cantilever bars and the 'dog bones' supplied.
|
Install the bags with the proper hardware.
|
Now install the shocks.
|
|
We had to clearance the notch for the bolt in panhard bar mount.
|
Install the panhard and center the rear end.
|
And now you have your parallel 4 link with cantilever attachments laid out on 22's.
|
|
All aired up, pretty good lift.
|
Another shot of the rear end laid out.
|
|